Skip to main content
S 349 119th Congress Senate Public Lands and Natural Resources

Fire-Safe Electrical Corridors Act of 2025

Introduced: January 30, 2025 Introduced by: Padilla, Alex Democratic · California See on congress.gov
Sign in to write a letter Sign in to watch
 Everywhere this bill has been 2 steps
Introduced
In committee
Reported out
Passed House
Passed Senate
To President
Became law
Jan 30, 2025
Read twice and referred to the Committee on Agriculture, Nutrition, and Forestry.
Jan 30, 2025
Introduced in Senate
 Plain-English summary Congressional Research Service

Fire-Safe Electrical Corridors Act of 2025

This bill allows the Forest Service to expedite the removal of trees or other vegetation near electrical lines on its lands under certain circumstances. Specifically, the Forest Service may include in special use permits or easements provided to electrical utilities permission to cut, remove, and sell trees or other vegetation near electrical lines on such lands without a separate timber sale if the cutting or removal is consistent with (1) the applicable land and resource management plan, and (2) other applicable environmental laws.

A special use permit or easement that includes permission for cutting and removal of trees or vegetation must include a requirement that, if the applicable electrical utility sells any portion of the material removed under the permit or easement, the utility must provide to the Forest Service any proceeds received from the sale, less any transportation costs incurred in the sale.

What's happening now January 30, 2025

Read twice and referred to the Committee on Agriculture, Nutrition, and Forestry.